PREMIUM, HIGH-QUALITY COPPER PRODUCTION

Minto operates the producing Minto mine located in the Minto Copper Belt, Yukon. The Minto mine has been in operation since 2007 with underground mining commencing in 2014. Since 2007, approximately 500Mlbs of copper have been produced from the Minto mine. The current mine operations are based on underground mining, a process plant to produce high-grade copper, gold and silver concentrate and all supporting infrastructure associated with a remote location in Yukon. The Minto property is located west of the Yukon River, about 20 km WNW of Minto Landing, the latter on the east side of the river, and approximately 250 road-km north of the City of Whitehorse, the capital city of Yukon.

The Minto mine sits within the Minto Copper Belt, a 42-kilometer-long northwest-trending corridor of copper-gold-silver mineralization in central Yukon. The copper mineralization found to date is hosted by migmatites (metamorphic rocks that have undergone high degrees of partial melting) in distinctive, flat-lying, structurally controlled orebodies open at depth and along strike Minto Metals is deploying state-of-the-art, innovative and disruptive technologies in the pursuit of not only additional orebodies at the mine site, but on their extensive land package in the Minto Copper Belt. We have engaged with Goldspot Discoveries Corp. and are working together utilizing proprietary machine learning workflows on re-processed and interpreted geological data to unlock the true mineral wealth of the Belt. We are excited about this potential and are employing a multi-year, systematic discovery plan testing these new targets in a respectful, environmentally conscious and sustainable manner.

 


Symbol MNTO:CA
Last
Change
Change %
Volume
Bid
Bid Size
Open
High
Low
Shares